- Dimensions without a tolerance on the drawing are made to ISO 2768-m. The rest follows the HexoParts technical standard (deburred edges, Ra 3.2, exact quantity, protective packaging).
- Threads and fits confirmed by the buyer on the 3D model are part of the specification.
- The scope of a job changes only through a formal change request passed on by HexoParts, never through agreements in messages.
- Update the production stage in the portal and report any risk to the date immediately, with the reason and new date.
For partners · Production and quality control
Specification, drawing and scope changes
The drawing is the contract. Dimensions without a tolerance are made to ISO 2768-m, and only a formal change request changes the scope.
Related articles
First article for batches of 20 pieces or moreFor batches of 20 pieces or more, you send a full measurement and photos of the first piece. You start the batch after HexoParts approves it.Reporting a risk of delayReporting a risk of delay at least 2 business days before the date moves the penalty threshold from the 3rd to the 5th day of delay.